    Design

    Designing smoke control begins with a risk analysis, which includes the evaluation of the required smoke extraction level. Smoke extraction requirements are classified into three levels:
    Level 1:
    Smoke is driven out via windows and doors exploiting the natural buoyancy of hot gases. No separate smoke extraction devices are installed.
    Level 2:
    The building has smoke extraction devices, which can be switched on by rescue services. Such devices may include ventilation vents and exhaust fans.
    Level 3:
    The smoke extraction system operates automatically.

    BestSes designs your smoke extraction system to meet all the legal requirements.

    We can do it.

    Contact us and we sort out a suitable solution and smoke extraction system to your property.